Does Airbyte scheduler catch up on failed incremental jobs?

  • Is this your first time deploying Airbyte?: No
  • OS Version: debian-10
  • Memory / Disk: 16GB
  • Deployment: Docker
  • Airbyte Version: 0.35.26-alpha
  • Source name/version: Salesforce 1.0.2
  • Destination name/version: BigQuery 1.0.2
  • Step: Salesforce incremental failed and recovered automatically
  • Description: I had a incremental salesforce job that faield 3 timess and then it recover on it’s own. I’m wondering if I should be worried about lost data or the airbyte scheduler caught up with the next run?

Hey @i-zaykov ideally we use state and pull the data in the later syncs so data should not be lost